CCTEG Coal Preparation General Contracting - Wangfenggang Plant
2020-10-29 23:05:15.0

<p>One of the most modern large-scale coking coal preparation plants in East China</p><p><br/></p><p><strong>Owner:&nbsp;</strong></p><p>Huainan Mining Group</p><p><br/></p><p><strong>Design annual production capacity:&nbsp;</strong></p><p>4 million tons / year</p><p><br/></p><p><strong>Major awards:&nbsp;</strong></p><p>bronze key award for excellent engineering general contracting project, gold award for excellent engineering general contracting project for coal industry (ministerial level), second prize for excellent engineering survey and design for coal industry (ministerial level)</p><p><br/></p><p><strong>Outstanding technical features:</strong></p><p>The project adopts domestic large-diameter pressureless three-product heavy medium cyclone. In the cyclone structure, the first and second sections are arranged in parallel side by side, which overcomes the defects of large resistance between the first and second sections of the prior pressureless three-product heavy medium cyclone, which is prone to turbulence. Not only improved the sorting index, but also improved the processing capacity of the equipment. The main plant construction adopts the steel-concrete frame structure, which combines the advantages of fast construction of steel frame structure and low cost of steel-concrete structure.</p><p><br/></p>